G. Greene completed the site work and installation of a new perimeter drainage system for Building 75 located at the Charlestown Navy Yard. The new drainage system incorporates a series of catch basins and trench drains that surround the building and tie into the existing storm drain. One of the major hurdles of this project was working in conjunction with the ground water affected by the tides of the nearby Boston Harbor.
|
 |
|
|
|