Eversource Energy - New Hampshire
Description
The G. Greene Civil & Utility Division completed a 345kV substation expansion. Scope of work included drilled caissons, cast in place concrete foundations, conduit grounding, grading, and fencing.
Approach
- Maintained a tight schedule for the owner
- Considered site soil conditions and proximity to the river throughout the entirety of the project
- Maintained access to adjacent 115 kV substation throughout construction
- Temporary access road for rigging of new transformer from nearby rail line
Results
- Installed 35 foot shafts for new transmission structures due to proximity of the river
- Installed over 50 foundations
- Installed drilled Caisson foundation
- Installation of 19,000 LF of ground grid
- Installation of 1,300 LF of cable trench
- 2.5 acres of finish grading and yard stone
- Excavated and backfilled for new underground duct banks