Mass General Hospital

Simches Lab – Boston MA

G. Greene completed a 7,500 s/f renovation to existing laboratory shell space with the Simches Building at Mass General Hospital. Major mechanical upgrades were completed, including the installation of new fume hoods, bio-hoods, and incubators. In addition, new medical gas systems and a reverse osmosis de-ionized water system were installed. New laboratory casework is featured throughout and a temperature-controlled room was constructed within the lab. This fast-track project was finished on schedule.