SBLI

Window/Façade Replacement – Woburn, MA

G. Greene completed the window and façade replacement to the five story building that suffered severe water damage throughout 50% of the inside perimeter and partial damage to the interior floors. G. Greene worked within the occupied facility to demolish and replace the existing studs, drywall, light gauge metal and insulation. In addition, over 245 windows were removed and re-installed with more effective water-resistant materials. Construction was performed in an occupied building meeting an extremely aggressive schedule.